Pulse Quick Start
Use this checklist to bench-test a Grillo Pulse before field installation.
Before connecting the sensor
Use only the supplied power adapter and barrel jack. Do not open the enclosure, change internal components, or connect a service cable unless instructed by Grillo Support.
1. Inspect and record
- Confirm whether the sensor uses cellular or Ethernet.
- Record the 12-character Device ID from the external label.
- Photograph the label before installation.
- Check the enclosure, power adapter, antennas, cables, and mounting parts for damage.
- Compare the shipment with its packing list.
Stop and contact support if an item is damaged, missing, or does not match the supplied instructions.
2. Prepare Grillo Platform
- Sign in at cloud.grillo.io.
- Select the intended organization.
- Create or select the destination seismic network.
- Open Sensors and choose Claim Sensor.
- Enter or scan the Device ID.
- Assign the planned FDSN station code.
The sensor can remain Offline until it is powered and connected.
3. Prepare connectivity
Cellular sensor
- Confirm that cellular service is active for the supplied SIM.
- Connect the supplied antennas to their labelled enclosure connectors.
- Test coverage at the intended site.
- Ask Grillo Support before replacing the SIM or changing cellular settings.
Ethernet sensor
- Connect the sensor to a network with internet access.
- Ask the network administrator to permit its outbound connection.
- Use the supplied weatherproof connection procedure for outdoor installations.
4. Power on
- Connect the supplied adapter to the sensor's barrel jack.
- Connect the adapter to power.
- Allow the sensor time to start and establish its network connection.
Use Grillo Platform—not internal LEDs—as the primary setup indicator.
5. Verify in Platform
- Select the correct organization and network.
- Find the exact Device ID and station code.
- Confirm Online.
- Confirm Last seen is current.
- Confirm the expected connection type.
- Confirm the firmware version is displayed.
Some health fields vary by sensor configuration. A blank or unavailable field does not necessarily indicate a fault.
If the sensor does not pass these checks, use Pulse troubleshooting before field deployment.
6. Prepare the field installation
- Record final coordinates and elevation.
- Choose a rigid, low-noise mounting surface.
- Plan antenna placement, drainage, cable strain relief, and physical security.
- Take the supplied enclosure and mounting instructions to the site.
- Repeat the Platform checks at the final location before leaving.
Continue with Physical Installation.